CONSTRUCTION UPDATE

Had a fantastically productive weekend deconstructing the cabin for the burn on Sunday the 23rd. Kate from FTY organized a work party on Saturday and while Gaelen and I pealed off the tin roof ridge, Kuenzi, Stella, Cara,Murphy and Greg all pitched in to take off the tin roof, build a shed for our bikes and lawnmower and stuff under the house, stack all the reclaimed wood, haul bags of recycled insulation up the hill to the Long House and even carry up the DC freezer to the Long House Porch. Awesome Crew!!!!

Sunday was a recover day and I built a small long tool shed next to the woodpile and moved the batteries, diversion control,, solar charge controller and heat dump up to its new home under the long house then wired everything together after refilling the batteries with distilled water and getting the leads ready for the solar panel and eventally the hydro-power.

On Monday I tackled the strapping and the rafters and managed by myself to remove all but eight rafters which I left in place so the end walls would not collapse in on the cabin. And today i got out the remaining windows, except for the big double paned one high on the West wall which I need help now to remove as I removed almost all the support and prying it out could be disastrous. I also wired in the solar panel and now we can use the batteries in the Long House instead of running the generator to power our lights. Next up, burning down the cabin!

The bike and lawnmower shed

Deconstructing our home of 6 years…

SENAN

My nephew Senan, Chuck’s son!

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.